Welcome,
Guest
|
|
How do I achieve a floor top level that is at the same level of the level where the walls start to be created from, rather than it being above the level.
E.G – The DP level is set at 150 & has engineering bricks to this course level. The screed top level is also at 150. See attached basic example. Could I just use a ceiling on the Basement level as the floor detail ? MD via email |